03b — Bev Stitely Advisory Roadmap (Placeholder)

This is a placeholder. Bev's roadmap has not been built. The interview has not yet been conducted.
Blocker: Bev's golden requires a live interview per file 06 of the universal kit. The 4/28 manager's meeting, 4/29 debrief with Steven and Jess, and her four MM appearances provide substrate for the patterns and the package-design layer — but they don't replace the structured interview that produces a golden-quality roadmap. She named the gap herself on 5/11: "I don't have a real good advisory onboarding document — I pulled up what accounting had and it was all technical."

Inputs partially ready

Spec for what this roadmap must show

Open items before production

When this gets replaced

After Bev's interview is conducted (per file 06), production runs against the universal kit. The output replaces this placeholder. Once Bev's golden exists, the universal kit's file 03 (composite) gets a Mode 2 pass to add the institutional layer.

Placeholder created 2026-05-19. Replace after Bev interview + universal kit Mode 1 production run.