Architecture at a Glance
| Assembly Line | Projects | Tier | Priority |
|---|---|---|---|
| Ruben Client Delivery | 1 Tier 1 + 4 Tier 2 = 5 projects | Mixed | Build first — Monday cycle |
| Top of Funnel | 6 projects (7th TBD) | Tier 1 | Build second — weekly campaigns |
| Standalone | 6–8 projects | Mixed | Set up as needed |
| Jen Bar | 1 project (for now) | Tier 2 | Keep as-is until constraints define |
| Tax Pro Collaborative | 1 project (existing workflow) | Tier 1 | Don't touch — it works |
Ruben Client Delivery — Assembly Line
Constraint Brief — arrives Friday from Ruben's ChatGPT
Session Transcript — Otter → Monday
Relay Output — Recap email + JSON (automated)
Project 1
Constraint Priority Matrix
Tier 1 · Agnostic
→
Project 2
Client Master Plan
Tier 2 · Ruben
→
Project 3
Project Plan
Tier 2 · Ruben
→
Project 4
Client Blueprint
Tier 2 · Ruben
→
Project 5
SOP / Build
Tier 2 · Ruben
Top of Funnel — Assembly Line
Client Work — ideas emerge from delivery
Design System — referenced by all production projects
Project 1
Idea Extraction
Tier 1
→
Project 2
Campaign Brief
Tier 1
→
Project 3
Thought Leadership
Tier 1
→
Project 4
Micro-Tools
Tier 1
→
Project 5
Social + Email
Tier 1
→
Project 6
Briefing
Tier 1
Workshop (monthly, paid) will become Project 7 when defined. For now, park it.
Status Legend
Exists — find it, load it
Hunt — exists somewhere in chats/projects, needs to be found
Build — doesn't exist yet, needs to be written
Version control rule: When you find a file and load it into a project, that project becomes the file's home. No copies elsewhere. If it needs to appear in multiple projects, load the same file. If you update it, update it there. The project IS the version control.
Ruben Client Delivery — Assembly Line
1
Constraint Priority Matrix
Tier 1
→
2
Client Master Plan
Ruben
→
3
Project Plan
Ruben
→
4
Client Blueprint
Ruben
→
5
SOP / Build
Ruben
Exists — load it
Hunt in chats
Needs to be written
1 · Constraint Priority Matrix
Tier 1
Claude Project
Partial — Needs Fresh Setup
▸
Takes any client's constraint brief + session transcript + Relay JSON + GPS goals → produces prioritized constraint matrix with dependencies, upstream/downstream typing, tiers, pattern flags. This is the diagnostic engine. Everything downstream depends on its output. Not branded to any client — Advisory OS only.
Instructions (Project Instructions Field)
constraint-priority-matrix-instructions.md — How to process inputs into matrix. Rules for dependency typing, tier assignment, pattern detection. One job: produce the matrix.
Search: "constraint priority matrix" "matrix instructions" "dependency typing"
Knowledge Files
constraint-terminology.md — Locked terminology: Recurring 🔁, Escalating 📈, Same Root Cause 📦, Solve Together ↔️, Upstream ⬆️, Downstream ⬇️. Confirm this is the latest version with "Solve Together" not "Synergy."
Search: "constraint terminology" "solve together" "locked conventions"
matrix-context.md — Context document explaining how the matrix connects to downstream document types. What each tier means. How GPS goals relate.
Search: "matrix context" "01-context"
Golden Examples
Golden matrix output — A complete matrix example showing correct formatting, typing, and tier assignment. Can be from Ruben's work but should be usable as a reference for any client.
Search: "constraint priority matrix" "C1" "C2" "matrix output"
Assembly line note: Output from this project → copy into Project 2 (Client Master Plan). If the chat is getting long, pull the matrix output as a clean artifact and start fresh in the next project.
2 · Client Master Plan — Ruben
Tier 2
Claude Project
Partial — Skill Exists
▸
Takes matrix output → updates Ruben's living master plan. GPS, themes, constraints, conversations, team context. Shared in session (shown, not handed over). Updated weekly after every matrix run. One job: keep the master plan current and accurate.
Instructions (Project Instructions Field)
master-plan-project-instructions.md — How to process matrix updates into the master plan. Quality rules (no fabricated quotes, engagement owner colors, linking rules). When to add vs. update vs. archive a constraint. Scoped to ONE job: master plan maintenance.
New file — extract the master plan portions from the old client-delivery-system-instructions.md. Search: "client delivery system instructions" "processing rules"
Skills (Knowledge Files — Skill Type)
crulliance-master-plan/SKILL.md — How to build and maintain Ruben's master plan. Methodology, structure, section definitions.
Search: "crulliance-master-plan" "SKILL.md" "master plan skill"
Knowledge Files
crulliance-brand/SKILL.md — Crulliance brand kit. Colors (#f8f7f4, #122640, #C4A44D, #3d7a5f), typography (Cormorant Garamond + Inter), engagement owner colors, terminology.
Search: "crulliance-brand" "crulliance brand skill"
crulliance-reference-data.md — Team roster (Pooja, Sarah, Anas, Jheanifer, Patty, Sariah, Krisha, Kevin, Ashwin, Nick), tools (Financial Cents, QBO, Liscio, Google Sheets), goals (40 new clients, retention targets, firm sale), proper nouns.
Search: "client reference data" "crulliance reference" "team roster"
constraint-terminology.md — Same file as Matrix project. Locked conventions.
Golden Examples
client-master-plan-ruben-cruz.html — The current master plan (updated through Feb 13, 15 passes). This IS the golden example AND the living document.
Should be in outputs from a past session. Search: "master plan alignment" "client master plan ruben"
Assembly line note: Matrix output comes in as input. Updated master plan is the output. Pass the key changes downstream to Project 3 (Project Plan).
3 · Project Plan — Ruben
Tier 2
Claude Project
Partial — Skill Exists
▸
Takes master plan updates → updates the active project plan. Currently: Accounting Manager OS. Matrix banner, GPS alignment, 5 builds, stakeholders, coaching notes. Advisor only — client never sees. One job: keep the project plan reflecting current reality.
Instructions (Project Instructions Field)
project-plan-project-instructions.md — How to process master plan changes into the project plan. What triggers a build resequence. How to update timelines, stakeholder notes, coaching adjustments. Scoped to project plan maintenance only.
New file — extract from old client-delivery-system-instructions.md
Skills
crulliance-project-plan/SKILL.md — Project plan structure, section definitions, build sequencing methodology.
Search: "crulliance-project-plan" "project plan skill"
Knowledge Files
crulliance-brand/SKILL.md — Same brand kit
crulliance-reference-data.md — Same reference data
constraint-terminology.md — Same terminology
Golden Examples
ruben-project-plan-accounting-mgr-os-feb-2026.html — Current project plan. Living document.
Should be in outputs. Search: "project plan accounting manager"
Assembly line note: Master plan changes come in. Updated project plan is the output. Key changes (especially build resequencing or timeline shifts) pass to Project 4 (Blueprint).
4 · Client Blueprint — Ruben
Tier 2
Claude Project
Partial — Skill Exists
▸
Takes project plan updates → updates the client-facing blueprint. Builds, timeline, outcomes. No diagnostic language, no advisor-only details. Client receives this. Crulliance branded. One job: keep the blueprint clean and client-appropriate.
Instructions
blueprint-project-instructions.md — How to translate project plan changes into client-facing language. What gets stripped (diagnostic terms, internal notes). Visibility rules. Quality standards for client-facing documents.
New file — extract from old instructions
Skills
crulliance-blueprint/SKILL.md — Blueprint structure, section definitions, client-facing language rules.
Search: "crulliance-blueprint" "blueprint skill"
Knowledge Files
crulliance-brand/SKILL.md
crulliance-reference-data.md
Golden Examples
ruben-blueprint-accounting-mgr-os-feb-2026.html
Search: "blueprint accounting manager"
5 · SOP / Build — Ruben
Tier 2
Claude Project
Partial — Skill Exists
▸
Produces the actual deliverables for the active constraint solve — SOPs, templates, tools, workflows. Team-facing documents in Crulliance branding. This is where the work product gets built. Separate from the Build Agent (which designs the deployment system). One job: produce constraint-specific deliverables.
Instructions
sop-build-project-instructions.md — How to produce SOPs and deliverables for a specific constraint. SOP structure rules (continuous cycle format, phase structure). Template standards. How to incorporate Pooja check-in calibration feedback.
New file — extract SOP production rules from old instructions + Crulliance SOP skill
Skills
crulliance-sop/SKILL.md — SOP production methodology, continuous cycle format, three-phase structure, quality standards.
Search: "crulliance-sop" "SOP skill" "month-end close"
Knowledge Files
crulliance-brand/SKILL.md
crulliance-reference-data.md
Golden Examples
ruben-sop-month-end-close-v3-feb-2026.html — 15-step, three-phase continuous cycle SOP. The best example of what a finished SOP looks like.
Search: "month-end close" "SOP V3"
Shared knowledge files across all Ruben Tier 2 projects: crulliance-brand/SKILL.md, crulliance-reference-data.md, and constraint-terminology.md appear in every Ruben project. Find them once, load them into all four. When they update, update in all four.
New instructions files needed: The old client-delivery-system-instructions.md tried to cover all four document types. You need to break it into four focused instruction files — one per project. The old file is your source material. Search: "client delivery system instructions" "processing rules" "input manifest"
Top of Funnel — Assembly Line
1
Idea Extraction
Tier 1
→
2
Campaign Brief
Tier 1
→
3
Thought Leadership
Tier 1
→
4
Micro-Tools
Tier 1
→
5
Social + Email
Tier 1
→
6
Briefing
Tier 1
Exists — load it
Hunt in chats
Needs to be written
The ToF assembly line is less built than Ruben's. The old monolithic ToF project has pieces of everything mixed together. Breaking it apart means extracting what works, writing fresh instructions for each scoped project, and establishing golden examples. Expect more red (build) dots here.
1 · Idea Extraction
Tier 1
Claude Project
Mostly Build
▸
Pulls thought leadership ideas from client work — constraint solves, session insights, methodology moments, patterns across clients. Input: session recaps, constraint briefs, matrix outputs, your own notes. Output: a ranked list of thought leadership angles with the "so what" for your audience. One job: find the ideas worth building campaigns around.
Instructions
idea-extraction-instructions.md — How to scan client work for teachable moments. Criteria for what makes a good campaign idea (audience relevance, offer connection, demonstrability). Output format: ranked angles with audience hook + offer tie-in.
Knowledge Files
advisory-os-offer-architecture.md — Your offer stack, price points, and positioning. Every idea needs to connect to an offer.
Search: "offer architecture" "offer stack" "reverse ladder" "scalable offer"
audience-profile.md — Who you're talking to: established advisory practices $500K–$2M, B2B consultants $250K–$2M, "Chief Everything Officer" problem.
Search: "audience profile" "ideal client" "chief everything officer"
past-campaigns-log.md — Running list of campaigns already done (The Proof Gap, etc.) so you don't repeat and can build on them.
Search: "proof gap" "campaign" "thought leadership piece"
Golden Examples
Example idea extraction output — A ranked list of 3–5 angles from a week's client work, showing the format downstream projects need.
2 · Campaign Brief
Tier 1
Claude Project
Mostly Build
▸
Takes the chosen idea → develops the full campaign strategy for the week. Sales goal, angle, target audience segment, constraint it addresses, which offer it connects to, CTA, narrative arc. This is the strategic brief that ALL downstream projects reference. One job: define what this week's campaign is about and why.
Instructions
campaign-brief-instructions.md — How to develop a campaign brief from an idea. Required fields: sales goal, target constraint, audience segment, offer tie-in, narrative arc, CTA, content distribution plan. How to ensure coherence across all 6+ campaign assets.
Knowledge Files
advisory-os-offer-architecture.md — Same as Project 1
audience-profile.md — Same as Project 1
advisory-os-brand/SKILL.md — Your brand voice, positioning, how you show up. Not the visual design system — the messaging identity.
Search: "advisory OS brand" "brand voice" "positioning"
Golden Examples
Example campaign brief — A complete brief for a past campaign (The Proof Gap would be ideal) showing all required fields and how they tie together.
3 · Thought Leadership Piece
Tier 1
Claude Project
Partial — Golden Examples Exist
▸
Takes campaign brief → produces the interactive HTML/React thought leadership piece. Full storytelling arc, production-grade, Advisory OS branded. This is the anchor content for the week. Everything else references it. One job: build the thought leadership piece to published quality.
Instructions
thought-leadership-production-instructions.md — How to turn a campaign brief into a complete thought leadership piece. Storytelling arc requirements, interactivity standards, production quality bar. This likely exists inside the old ToF project instructions.
Search: "thought leadership" "interactive HTML" "storytelling arc" "production" inside old ToF project
Skills
thought-leadership-SKILL.md — If one exists. May need to be extracted from the old ToF project instructions.
Search: "thought leadership skill" "TL production"
Knowledge Files
Design System (HTML) — The full design system document. Referenced for visual components, layout patterns, interaction patterns.
advisory-os-brand/SKILL.md — Brand voice for content
Golden Examples
The Proof Gap — Published HTML thought leadership piece. This is your primary golden example.
Other completed campaigns — Any additional published TL pieces.
Gather all published TL pieces as golden examples. These are the quality bar.
4 · Micro-Tools
Tier 1
Claude Project
Partial — Process Doc + 1 Skill Exist
▸
Takes the thought leadership piece → builds 2 micro-tools that complement it. Each tool makes the TL piece's insight actionable. Format rotates: calculator, revelation tool, diagnostic, comparison, swipe file. ~80–95 min per tool. These are the hand-raiser magnets. One job: build the micro-tools.
Instructions
micro-tool-build-process.md — The 6-step process: define job → design questions → design results → choose direction → build HTML → review/ship. Should exist.
Search: "micro-tool build process" "micro tool" "6-step"
Skills (by tool type — load the relevant one per build)
revelation-tool-SKILL.md — Revelation tool methodology.
calculator-SKILL.md — TBD. Build when first calculator is produced.
diagnostic-SKILL.md — TBD.
comparison-SKILL.md — TBD.
swipe-file-SKILL.md — TBD.
Knowledge Files
Design System (HTML)
advisory-os-brand/SKILL.md
Golden Examples
Published micro-tools — Any completed, published tools from past campaigns.
Search: "micro-tool" "revelation tool" "hand-raiser" — find the finished HTML files
5 · Social + Email Content
Tier 1
Claude Project
Mostly Build
▸
Takes thought leadership piece + micro-tools → produces all distribution content. LinkedIn posts (TL piece post + 2 hand-raiser posts), Lead Shark DMs for asset delivery, GetSales follow-up DMs, conversation starters, and weekly email to list (TL piece + tools + briefing invite). One job: produce all the distribution content for the campaign.
Instructions
social-email-production-instructions.md — LinkedIn post format/voice, hand-raiser post structure (keyword trigger for Lead Shark), DM templates, email structure. Platform-specific rules. How everything references the same campaign narrative.
Knowledge Files
lead-shark-setup-guide.md — How Lead Shark works: keyword monitoring, first-degree auto-DM, non-connection routing to GetSales. What it needs from you per post.
Search: "lead shark" "hand-raiser" "GetSales" "LinkedIn automation"
advisory-os-brand/SKILL.md
email-list-context.md — Current list size (~280), platform, sending patterns, what's working.
Search: "email list" "email marketing" "deliverability"
Golden Examples
Past LinkedIn posts + emails — Successful hand-raiser posts, TL piece announcement posts, weekly emails.
Search: "LinkedIn post" "hand-raiser" "weekly email" "campaign email"
6 · Briefing Production
Tier 1
Claude Project
Mostly Build
▸
Takes the full campaign → produces the briefing video assets. The briefing is a 10–15 min screen-shared recording, time-gated to Sunday midnight, with a fallback version after expiry and an evergreen mini-site version. Output: briefing script + screen-share document (the visual you record over). One job: produce the briefing package.
Instructions
briefing-production-instructions.md — Script structure (10–15 min), screen-share document format, time-gating specs, fallback version specs, evergreen mini-site version. How to connect back to the week's TL piece + tools + CTA.
Knowledge Files
Design System (HTML) — For the screen-share document design
advisory-os-brand/SKILL.md
briefing-format-spec.md — Time-gating implementation, fallback behavior, evergreen conversion rules.
Search: "briefing" "time-gated" "Sunday midnight" "fallback" "evergreen"
Golden Examples
Past briefing scripts + screen-share documents
Search: "briefing script" "briefing video" "briefing document"
Workshop (Project 7 — Future): Monthly paid workshop offer. Not enough definition yet to spec the project. When you're ready, it will likely need: workshop-production-instructions.md, a workshop-SKILL.md, the Design System, and a golden example from your first one. Park it until defined.
Standalone Projects
These don't sit in an assembly line but support the system. Set up as needed — prioritize based on what's blocking you.
Design System
Tier 1
Claude Project
Exists — Needs Fresh Project
▸
The living design system. Referenced by all production projects. When you need a new design configuration (workshop instead of briefing, new asset type), you pull the design system into a chat, describe what you need, iterate, prove it, and then extract a skill document for the new component. The Design System grows as you prove new patterns.
Instructions
design-system-instructions.md — How to extend the design system. When a new component is proven, how to extract a skill. Rules for maintaining consistency while evolving.
Knowledge Files
The Design System HTML — The master document. Contains all visual specs, component definitions, patterns.
Build Agent / Deployment Design
Tier 1
Claude Project
Partial
▸
Designs the deployment system for a constraint solve — BEFORE anything gets built. This is the strategic layer: given this constraint, what's the deployment package? (Which SOPs, templates, tools, workflows are needed? In what order? Who uses each piece?) The SOP/Build project in the Ruben line then executes the deployment design. Separate from SOP production.
Instructions
build-agent-instructions.md — How to design a deployment package from a constraint solve. Framework for determining what deliverables are needed.
Search: "build agent" "deployment" "deployment system"
Knowledge Files
Solution packet anatomy — The 6-piece structure (START-HERE, process-agent, process-consultant, context, golden example, QC checklist). How pre-built packets map to deployment designs.
Search: "solution packet" "six-piece anatomy" "START-HERE"
Proposal System
Tier 1
Claude Project
Partial — Exists, Needs Fresh Setup
▸
Creates custom proposals for prospects and existing client extensions. Straddles My Business (new prospects) and Client Delivery (extending engagements). For you right now; potentially deployable to clients later.
Instructions
proposal-system-instructions.md — How to produce proposals from matrix + transcript + JSON + advisor knowledge. Should exist from prior builds.
Search: "proposal system" "proposal instructions" "custom proposal"
Knowledge Files
advisory-os-offer-architecture.md — Offer stack, pricing
advisory-os-brand/SKILL.md
Golden Examples
Past proposals — Ruben's, any prospect proposals.
Search: "proposal" "Ruben proposal" "Crulliance proposal"
Case Study / Proof Engine
Tier 1
Claude Project
Complete — Set Up Fresh
▸
Complete system: interview protocol → extraction → agent build (V1 + V2 anonymized) → QC → delivery. 11 files. Rob Foncannon golden examples. Also a $497 offer. This one is done — just needs to be set up in a fresh project with all 11 files loaded.
Files to Load (all exist)
All 11 Case Study / Proof Engine files
Search: "case study" "proof engine" "Rob Foncannon" "interview protocol" — find all 11 and load them
Authority Website System
Tier 1
Claude Project
Exists — Needs Fresh Setup
▸
Full design system for building client authority websites. Connects to Website Evaluation Tool. Also built Advisory OS website. Being used actively with Jen Bar right now.
Files to Load
Authority website instructions + design methodology
Search: "authority website" "website system" "website design system"
Jen Bar — Single Client Project
Tier 2
Claude Project
Set Up Fresh
▸
Jen stays as one project for now. Her constraints aren't defined enough for the assembly line structure. You're solving constraint-by-constraint in small weekly bites. Authority website is nearly done. When her engagement matures to where Ruben's is, mirror the Tier 2 structure. For now: one project, her reference data, her brand, and whatever's active.
What to Load
jen-bar-reference-data.md — Her business context, goals, team, tools, proper nouns.
jen-bar-brand-kit.md — If one exists. If not, build a mini brand kit.
Authority website work — Current state of the website build, service lines, AI version, copy.
Search: "Jen Bar" "Jen" "authority website"
Tax Pro Collaborative
Tier 1
Claude Project
Exists — Don't Rebuild
▸
Group program. Momentum Monday, Thursday co-working, monthly 1:1s. Existing workflow is clean — constraint brief across the group → Friday email → Monday session → recap. Potentially sunsetting. Do not over-rotate. Just set up a fresh project with the existing instructions and keep running it.
What to Load
Existing Tax Pro Collaborative instructions + workflow
Search: "Tax Pro Collaborative" "momentum Monday" "tax pro"
Methodology Refinement
Tier 1
Claude Project
Future — Build When Needed
▸
Where you improve how master plans, SOPs, blueprints, and project plans work in general — before pushing updates to Tier 2 projects. This is where methodology changes get tested before they hit live client projects. Not urgent. Build this when you have a methodology change to test.
New Client Setup
Tier 1
Claude Project
Future — Build When Next Client Signs
▸
Onboarding workflow: brand kit creation, reference data population, first constraint identification, first deployment plan. Duplicate Tier 2 structure and load client-specific files. Build this from the pattern that emerges from Ruben + Jen. Not urgent until your next client signs.
Front Offer Page Builder
Tier 1
Claude Project
Exists — Set Up When Needed
▸
Builds front offer pages. Used for your own business and clients (Linda's $2,500 service sprint). Set up fresh when you need it next.
Files to Find
Search: "front offer page" "offer page builder" "Linda"
Retrieval Checklist
Everything you need to find, organized by priority. Hunt these down, then load them into the right projects.
Hunt Exists somewhere — search for it
Build Doesn't exist — needs to be written
Ready You know where this is
Priority 1 — Ruben Assembly Line (Load First)
These files get you running the Monday cycle. Find them all before setting up the 5 projects.
Shared Across All Ruben Projects (Find Once, Load 4x)
Hunt
crulliance-brand/SKILL.md + supporting files
Search: "crulliance-brand" "crulliance brand skill"
→ Load into: Master Plan, Project Plan, Blueprint, SOP/Build
Search: "crulliance-brand" "crulliance brand skill"
→ Load into: Master Plan, Project Plan, Blueprint, SOP/Build
Hunt
crulliance-reference-data.md (team, tools, proper nouns)
Search: "client reference data" "crulliance reference" "team roster"
→ Load into: Master Plan, Project Plan, Blueprint, SOP/Build
Search: "client reference data" "crulliance reference" "team roster"
→ Load into: Master Plan, Project Plan, Blueprint, SOP/Build
Hunt
constraint-terminology.md (locked conventions, "Solve Together" not "Synergy")
Search: "constraint terminology" "locked conventions" "solve together"
→ Load into: Matrix, Master Plan, Project Plan, Blueprint, SOP/Build
Search: "constraint terminology" "locked conventions" "solve together"
→ Load into: Matrix, Master Plan, Project Plan, Blueprint, SOP/Build
Project 1 — Constraint Priority Matrix
Hunt
Matrix instructions / processing rules
Search: "constraint priority matrix" "matrix instructions" "dependency typing"
→ Project Instructions field
Search: "constraint priority matrix" "matrix instructions" "dependency typing"
→ Project Instructions field
Hunt
Matrix context document (01-context.md)
Search: "matrix context" "01-context"
→ Knowledge file
Search: "matrix context" "01-context"
→ Knowledge file
Hunt
Golden matrix output
Search: "constraint priority matrix" "C1" "C2" "matrix output"
→ Knowledge file (golden example)
Search: "constraint priority matrix" "C1" "C2" "matrix output"
→ Knowledge file (golden example)
Project 2 — Client Master Plan (Ruben)
Hunt
crulliance-master-plan/SKILL.md
Search: "crulliance-master-plan" "master plan skill"
→ Knowledge file (skill)
Search: "crulliance-master-plan" "master plan skill"
→ Knowledge file (skill)
Hunt
client-master-plan-ruben-cruz.html (golden example + living doc)
Search: "master plan alignment" "client master plan ruben" — check past outputs
→ Knowledge file (golden example)
Search: "master plan alignment" "client master plan ruben" — check past outputs
→ Knowledge file (golden example)
Build
master-plan-project-instructions.md
Extract master plan portions from old client-delivery-system-instructions.md. Search: "client delivery system instructions" "processing rules"
→ Project Instructions field
Extract master plan portions from old client-delivery-system-instructions.md. Search: "client delivery system instructions" "processing rules"
→ Project Instructions field
Project 3 — Project Plan (Ruben)
Hunt
crulliance-project-plan/SKILL.md
Search: "crulliance-project-plan" "project plan skill"
→ Knowledge file (skill)
Search: "crulliance-project-plan" "project plan skill"
→ Knowledge file (skill)
Hunt
ruben-project-plan-accounting-mgr-os-feb-2026.html
Search: "project plan accounting manager" — check past outputs
→ Knowledge file (golden example)
Search: "project plan accounting manager" — check past outputs
→ Knowledge file (golden example)
Build
project-plan-project-instructions.md
Extract from old client-delivery-system-instructions.md
→ Project Instructions field
Extract from old client-delivery-system-instructions.md
→ Project Instructions field
Project 4 — Client Blueprint (Ruben)
Hunt
crulliance-blueprint/SKILL.md
Search: "crulliance-blueprint" "blueprint skill"
→ Knowledge file (skill)
Search: "crulliance-blueprint" "blueprint skill"
→ Knowledge file (skill)
Hunt
ruben-blueprint-accounting-mgr-os-feb-2026.html
Search: "blueprint accounting manager" — check past outputs
→ Knowledge file (golden example)
Search: "blueprint accounting manager" — check past outputs
→ Knowledge file (golden example)
Build
blueprint-project-instructions.md
Extract from old client-delivery-system-instructions.md
→ Project Instructions field
Extract from old client-delivery-system-instructions.md
→ Project Instructions field
Project 5 — SOP / Build (Ruben)
Hunt
crulliance-sop/SKILL.md
Search: "crulliance-sop" "SOP skill" "month-end close"
→ Knowledge file (skill)
Search: "crulliance-sop" "SOP skill" "month-end close"
→ Knowledge file (skill)
Hunt
ruben-sop-month-end-close-v3-feb-2026.html
Search: "month-end close" "SOP V3" — check past outputs
→ Knowledge file (golden example)
Search: "month-end close" "SOP V3" — check past outputs
→ Knowledge file (golden example)
Build
sop-build-project-instructions.md
Extract SOP production rules from old instructions + crulliance-sop skill
→ Project Instructions field
Extract SOP production rules from old instructions + crulliance-sop skill
→ Project Instructions field
Priority 2 — Top of Funnel Assembly Line
More hunting, more building. The old monolithic ToF project is the main source. Pull it apart.
Hunt
Old Top of Funnel project instructions (the monolithic version — this is your source material for breaking into 6 projects)
Search: "top of funnel" "campaign production" "weekly campaign"
→ Source for all 6 ToF project instruction files
Search: "top of funnel" "campaign production" "weekly campaign"
→ Source for all 6 ToF project instruction files
Hunt
advisory-os-offer-architecture.md (offer stack, pricing, positioning)
Search: "offer architecture" "offer stack" "reverse ladder" "scalable offer"
→ Load into: Idea Extraction, Campaign Brief, Proposal System
Search: "offer architecture" "offer stack" "reverse ladder" "scalable offer"
→ Load into: Idea Extraction, Campaign Brief, Proposal System
Hunt
advisory-os-brand/SKILL.md (brand voice, messaging identity)
Search: "advisory OS brand" "brand voice" "positioning"
→ Load into: Campaign Brief, Thought Leadership, Social+Email, Briefing
Search: "advisory OS brand" "brand voice" "positioning"
→ Load into: Campaign Brief, Thought Leadership, Social+Email, Briefing
Ready
Design System (HTML)
You know where this is
→ Load into: Thought Leadership, Micro-Tools, Briefing, Design System project
You know where this is
→ Load into: Thought Leadership, Micro-Tools, Briefing, Design System project
Ready
The Proof Gap + other published TL pieces
Published HTML files
→ Golden examples for Thought Leadership project
Published HTML files
→ Golden examples for Thought Leadership project
Hunt
micro-tool-build-process.md
Search: "micro-tool build process" "micro tool" "6-step"
→ Instructions for Micro-Tools project
Search: "micro-tool build process" "micro tool" "6-step"
→ Instructions for Micro-Tools project
Ready
revelation-tool-SKILL.md
Should be findable
→ Knowledge file (skill) for Micro-Tools project
Should be findable
→ Knowledge file (skill) for Micro-Tools project
Hunt
Published micro-tools (completed HTML tools from past campaigns)
Search: "micro-tool" "revelation tool" "hand-raiser"
→ Golden examples for Micro-Tools project
Search: "micro-tool" "revelation tool" "hand-raiser"
→ Golden examples for Micro-Tools project
Hunt
Past LinkedIn posts, emails, DMs
Search: "LinkedIn post" "hand-raiser" "weekly email" "campaign email"
→ Golden examples for Social+Email project
Search: "LinkedIn post" "hand-raiser" "weekly email" "campaign email"
→ Golden examples for Social+Email project
Hunt
Briefing scripts + screen-share documents
Search: "briefing script" "briefing video" "briefing document" "time-gated"
→ Golden examples for Briefing project
Search: "briefing script" "briefing video" "briefing document" "time-gated"
→ Golden examples for Briefing project
New Files to Build for ToF
Build
idea-extraction-instructions.md
→ Project Instructions for Idea Extraction
→ Project Instructions for Idea Extraction
Build
campaign-brief-instructions.md
→ Project Instructions for Campaign Brief
→ Project Instructions for Campaign Brief
Build
thought-leadership-production-instructions.md (extract from old ToF)
→ Project Instructions for Thought Leadership
→ Project Instructions for Thought Leadership
Build
social-email-production-instructions.md
→ Project Instructions for Social+Email
→ Project Instructions for Social+Email
Build
briefing-production-instructions.md
→ Project Instructions for Briefing
→ Project Instructions for Briefing
Build
audience-profile.md
→ Knowledge file for Idea Extraction + Campaign Brief
→ Knowledge file for Idea Extraction + Campaign Brief
Build
past-campaigns-log.md (running log of completed campaigns)
→ Knowledge file for Idea Extraction
→ Knowledge file for Idea Extraction
Priority 3 — Standalone Projects (As Needed)
Hunt
Case Study / Proof Engine — all 11 files
Search: "case study" "proof engine" "Rob Foncannon" "interview protocol"
Search: "case study" "proof engine" "Rob Foncannon" "interview protocol"
Hunt
Proposal System — instructions + golden examples
Search: "proposal system" "proposal instructions" "custom proposal"
Search: "proposal system" "proposal instructions" "custom proposal"
Hunt
Build Agent — instructions + deployment methodology
Search: "build agent" "deployment system" "deployment"
Search: "build agent" "deployment system" "deployment"
Hunt
Authority Website System — instructions + methodology
Search: "authority website" "website system" "website design"
Search: "authority website" "website system" "website design"
Hunt
Front Offer Page Builder — instructions
Search: "front offer page" "offer page builder"
Search: "front offer page" "offer page builder"
Hunt
Tax Pro Collaborative — existing instructions + workflow
Search: "Tax Pro Collaborative" "momentum Monday" "tax pro"
Search: "Tax Pro Collaborative" "momentum Monday" "tax pro"
Hunt
Jen Bar — authority website work, reference data, brand
Search: "Jen Bar" "Jen" "authority website"
Search: "Jen Bar" "Jen" "authority website"
Hunt
Old client-delivery-system-instructions.md (source material for 4 new instruction files)
Search: "client delivery system instructions" "processing rules" "input manifest"
Search: "client delivery system instructions" "processing rules" "input manifest"
Retrieval strategy: Start with the Ruben shared files (brand, reference data, terminology) since they go into 4–5 projects each. Then work down the list project by project. When you find something, immediately load it. Don't collect everything first — you'll lose track. Find → load → move on.