← Vault Index
Source: business/marketing/campaigns/practice-builders-workshop/STATUS.md

STATUS β€” The 90-Second Pipelineβ„’ Workshop

πŸ—‚οΈ ARCHIVED (2026-06-07) β€” kept as an experiment record, not deleted. The $17 live workshop ("90-Second Pipeline," June 3 2026) didn't convert β€” the live/scheduled format drew zero buyers across the live-event tests. Parked as part of the inventory of what we've tried; may have been the right idea at the wrong time. Not a rung in the current funnel. See business-aos/decisions/2026-06-07-near-term-revenue-plan-and-email-funnel.md.

Campaign: Practice Builders Workshop Offer: $17 live build session, June 3, 2026 Last updated: 2026-05-29


URLs

AssetURL
Sales pagehttps://thepracticebuilders.ai/90-second-pipeline
Thank you pagehttps://thepracticebuilders.ai/90-second-pipeline-thank-you
ThriveCart checkouthttps://kathrynhbrown.thrivecart.com/90-second-pipeline/
Zoom (direct link)https://us02web.zoom.us/j/86209080156?pwd=eSiZQ4wVT05NLBODWrenacxBpeVrQU.1
Notion product pagehttps://www.notion.so/36fa879ece9d814cb443c81a1885dac6

File Inventory

FileWhat It IsStatus
workshop-sales-page.htmlConvertri sales page HTMLLive β€” maturity framing corrected (four levels, Level 3 workshop), membership FAQ added. Needs Convertri re-paste.
workshop-sales-page.mdSales page content (markdown source)Live β€” maturity framing corrected (four levels, Level 3 workshop)
workshop-thank-you.htmlConvertri thank you page HTMLLive β€” calendar links added, three-skill language
workshop-delivery-email.mdMailerLite delivery email + 3 pre-workshop remindersReady to build in MailerLite
workshop-nurture-email-draft.mdEmail 2 announcement (1 universal version)Scheduled β€” May 22 (MailerLite + LinkedIn list)
workshop-email-sequence-plan.mdFull 5-email nurture plan + buyer sequence planPlan complete β€” maturity framing corrected
workshop-skeleton.mdInternal workshop agenda / run-of-showDraft β€” maturity framing corrected (four levels, Level 3 workshop)
thrivecart-checkout-copy.mdThriveCart checkout page copy referenceLive β€” guarantee updated to 7-day
workshop-nurture-email-3-faq.mdEmail 3 FAQ (1 universal version)Drafted β€” copy QC'd, sentence edited, ready for Kathryn review
workshop-new-entrant-pitch.mdCondensed workshop pitch for new funnel entrantsDrafted β€” needs QC
mailerlite-segmentation-fix.mdSegmentation gap fix + MailerLite setup instructionsReference β€” action items for Kathryn
practice-builders-framework.mdWIN / DELIVER / GROW framework docReference β€” maturity model correct (four levels)
workshop-presentation.htmlWorkshop deck β€” first draft (Cole)Superseded by v2. Content outline only β€” maturity framing was wrong.
wip/workshop-presentation-v2.htmlWorkshop deck β€” visual build (Wren)Draft β€” CYP brand, correct maturity framing, needs Kathryn review
wip/deck-copy-review.mdSloane's copy review of deck v1Complete β€” flagged maturity framing, verbal tightening, offer wording
wip/post-workshop-emails.md3-email post-workshop sequence (Sloane)Draft β€” needs recording link, membership link, rate-lock timing decision

Notion Product Page

Page: The 90-Second Pipelineβ„’ (workspace-level, NOT under 52 Skills) URL: https://www.notion.so/36fa879ece9d814cb443c81a1885dac6 Status: Built β€” self-contained product, needs Kathryn review

Contains:

Production notes:


Presentation Deck

Current version: wip/workshop-presentation-v2.html (Wren build) Status: Draft β€” needs Kathryn review, Notion link embed needed

What's done:

What's needed:


Platform Status

PlatformStatusNotes
ThriveCartLive$17 checkout, webhook to MailerLite group
Sales page (Convertri)Needs re-pasteHTML updated with maturity framing corrections + membership FAQ. Kathryn must re-paste into Convertri.
Thank you page (Convertri)LiveCalendar links (Google + Outlook), Zoom direct link
MailerLite β€” delivery automationNot yet builtCopy ready in workshop-delivery-email.md
MailerLite β€” pre-workshop remindersNot yet builtCopy ready in workshop-delivery-email.md (3 emails)
MailerLite β€” nurture sequence (5 emails)Email 2 sent May 22 (191 recipients)Email 1 skipped (teaching story never provided). Email 3 drafted. Emails 4-5 not yet drafted.
MailerLite β€” universal segmentBuilt β€” needs fixCurrent segment catches new entrants who never saw announcement. Add "received campaign" filter. See mailerlite-segmentation-fix.md.
MailerLite β€” new entrant automationNot yet builtCopy ready in workshop-new-entrant-pitch.md. Setup steps in mailerlite-segmentation-fix.md.
MailerLite β€” post-workshop automationNot yet builtCopy ready in wip/post-workshop-emails.md (3 emails). Needs recording link + membership link.
ZoomLiveRegistration turned off, direct link only

Email Sequences

Nurture Sequence (Non-Buyers) β€” Scheduled Campaigns

EmailDateStatus
1 β€” Teaching storyMay 22 (Thu)Blocked β€” needs real pipeline story from Kathryn
2 β€” System reveal (announcement)May 22 (Thu)Sent β€” 191 recipients, 41% open rate, 1.6% click rate
3 β€” FAQMay 28 (Wed)Drafted β€” copy QC'd, sentence edited. workshop-nurture-email-3-faq.md. Segmentation fix required: add "received announcement campaign" filter before sending (see mailerlite-segmentation-fix.md)
4 β€” Value stackMay 31 (Sat)Planned β€” not yet drafted. Same segmentation fix needed.
5 β€” Last callJun 2 (Mon)Planned β€” not yet drafted. Same segmentation fix needed.
New entrant pitchAutomation (1-day delay)Drafted β€” workshop-new-entrant-pitch.md. Needs automation built in MailerLite dashboard.

Buyer Sequence β€” MailerLite Automation

EmailTimingStatus
DeliveryImmediateDrafted β€” workshop-delivery-email.md
Pre-work nudgeMay 31 (3 days before)Drafted β€” workshop-delivery-email.md
Day-beforeJun 2Drafted β€” workshop-delivery-email.md
Day-ofJun 3, 10am ETDrafted β€” workshop-delivery-email.md
Recording + recapJun 3 eveningDrafted β€” wip/post-workshop-emails.md Email 1. Needs recording link.
Value reinforcementJun 4Drafted β€” wip/post-workshop-emails.md Email 2.
Membership bridgeJun 5Drafted β€” wip/post-workshop-emails.md Email 3. Needs membership link. $27/mo rate.
Rate lock expiresJun 6 or 7Not yet drafted β€” depends on escalation timing decision

Blockers

BlockerOwnerStatus
Teaching story for Email 1KathrynBlocked β€” need to wire up 3 skills into system, run it, extract story
Three-skill system briefJulesNot yet started β€” Pipeline Review + Follow-Up Writer + Referral Ask Builder
MailerLite universal segmentKathrynDone β€” built with 5 include groups + 2 exclusions
Post-workshop emails (recording, membership bridge)SloaneDrafted β€” 3 emails in wip/post-workshop-emails.md. Rate lock email still needs timing decision.
Nurture emails 4-5SloaneNot yet drafted β€” can draft independently of Email 1
Sequence start dateβ€”Resolved β€” Email 2 (announcement) sends first on May 22. Email 1 (teaching story) still blocked, will shift or be cut.
Segmentation gapKathrynNew β€” must fix FAQ email filter + build new-entrant automation before Meta goes live May 28. Full instructions in mailerlite-segmentation-fix.md.
ThriveCart β†’ MailerLite webhookKathrynVerify β€” both workshop groups have 0 subscribers. If webhook isn't live, buyers won't be excluded from nurture.
Recording linkKathrynNeeded for post-workshop Email 1. Available after June 3.
Membership linkKathrynNeeded for post-workshop Email 3 and deck. Full rollout spec: ../practice-builders-os/pbos-rollout-spec.md
Video walkthrough embedKathrynNotion product page has placeholder. Add Vimeo/Loom embed after recording is produced.
Facilitation guideColeNot yet started β€” live run-of-show with timing cues, screen/verbal alignment, attendee checkpoints.
Deck copy editsWrenApply Sloane's copy review (wip/deck-copy-review.md) to v2 deck β€” Level 2β†’3 labeling on slides 10-11, verbal tightening on slides 4, 9, 12.
Convertri sales page re-pasteKathrynHTML file corrected (four levels, Level 3, membership FAQ added). Kathryn needs to re-paste updated HTML into Convertri.

MailerLite Groups

GroupHow PopulatedWhat It Triggers
Start \Workshop-90 Second PipelineThriveCart $17 webhookDelivery email automation
Complete \Workshop-90 Second PipelineThriveCart $17 completionTracking only

Key Decisions Made


Maturity Framing Audit (2026-05-29)

All campaign files audited for correct maturity model framing.

FileHad IssuesFixed
workshop-sales-page.mdYes β€” "three levels" (2 instances)Fixed to "four levels" + Level 3 workshop
workshop-skeleton.mdYes β€” "Structure" as today's build + "three levels"Fixed to Level 3/Delegate + four levels
workshop-email-sequence-plan.mdYes β€” "Structure (Level 1)" + "three levels"Fixed to Level 3/Delegate + four levels
workshop-delivery-email.mdNo maturity framingNo changes needed
thrivecart-checkout-copy.mdNo maturity framingNo changes needed
workshop-nurture-email-draft.mdNo maturity framingNo changes needed
workshop-nurture-email-3-faq.mdNo maturity framingNo changes needed
workshop-new-entrant-pitch.mdNo maturity framingNo changes needed
practice-builders-framework.mdCorrect (four levels)No changes needed
workshop-sales-page.htmlFixed β€” "first piece" β†’ "one piece" + four levels + Level 3 context + membership FAQ addedKathryn must re-paste corrected HTML into Convertri
wip/workshop-presentation-v2.htmlCorrect (four levels, Level 3 highlighted)No changes needed
wip/post-workshop-emails.mdCorrect (Level 2β†’3 framing)No changes needed
wip/deck-copy-review.mdN/A β€” review doc that flags the issuesNo changes needed