Source: business/marketing/campaigns/delegation-infrastructure/STATUS.md
Delegation Infrastructure — Campaign
Concept
Practice owners who try delegating, fail, conclude the problem is the person — when the real problem is there's no system to delegate INTO. Composited from a real consulting engagement: 70+ examples extracted, 45-minute production set vs. days.
File Inventory
Article (Long-form)
| File | Status | Notes |
delegation-vacuum.html | Built — needs deploy confirmation | "Nobody Studied the Finished Deliverables" — interactive narrative with Instruction Gap + Delegation Readiness Diagnostic |
~~instruction-gap-interactive.html~~ | Moved to content/frameworks/instruction-gap/ | Standalone Instruction Gap page (AOS brand) |
~~instruction-gap-pb.html~~ | Moved to content/frameworks/instruction-gap/ | Practice Builders version |
delegation-vacuum-v3.html | Reference only | Claude Chat version — prose improvements merged into main file, no diagnostic |
Content (Captions / Long-form Markdown)
| File | Status | Notes |
delegation-infrastructure-content-2026-05-03.md | Production-ready, QC'd | 3 LinkedIn posts (Pattern / Before-After / Capability) |
organic-batch-001.md | Production-ready, QC'd | 1 FB (Problem-Solution) + 1 IG (Contrarian) static |
organic-batch-002.md | Production-ready, QC'd | 1 LinkedIn (Deliverables Already Exist) + 1 FB (Hiring Trap) + 1 IG (Inheritance) |
Image HTML (Render-to-PNG required before posting)
| File | Notes |
screenshot-01-delegation-infrastructure-fb.html | Batch 001 FB image (1080x1080) |
screenshot-01-delegation-infrastructure-ig.html | Batch 001 IG image (1080x1350) |
screenshot-01-delegation-infrastructure-linkedin.html | LinkedIn variant — reserved |
screenshot-02-delegation-infrastructure-fb.html | Batch 002 FB image |
screenshot-02-delegation-infrastructure-ig.html | Batch 002 IG image |
screenshot-02-delegation-infrastructure-linkedin.html | Batch 002 LinkedIn image |
WIP / Ready-to-Ship
| File | Status | Notes |
wip/linkedin-post-1-ready-2026-05-18.md | LIVE — shipped week of 5/4 | LinkedIn Post 1 ("The Pattern") — strongest opener per content score. Article link in first comment: advisoryos.ai/delegation-vacuum. NOTE: Duplicate posted in error 5/21, Kathryn deleted it. |
wip/linkedin-post-2-paste-ready.txt | Paste-ready — NOT YET POSTED | LinkedIn Post 2 ("The Before/After") — next to ship. |
Distribution Plan
8 total posts staggered across 1-2 weeks. Cadence rule (from batch 002 next-steps): stagger across platforms, don't publish on the same day.
| # | Date | Platform | Post |
| 1 | Mon 5/4 | LinkedIn | Post 1: The Pattern + article link in first comment |
| 2 | TBD | LinkedIn | Post 2: The Before/After |
| 3 | TBD | LinkedIn | Post 3: The Capability |
| 4 | TBD | LinkedIn | Post 4 (batch 002): The Deliverables Already Exist |
| 5 | TBD | Facebook | Batch 001: Problem-Solution |
| 6 | TBD | Facebook | Batch 002: Hiring Trap |
| 7 | TBD | Instagram | Batch 001: Contrarian |
| 8 | TBD | Instagram | Batch 002: Inheritance |
Open Questions / Blockers
- [ ] Article URL — what's the production URL after deploy? Needed for first-comment links on every LinkedIn post and bio link on Instagram.
- [ ] Cadence — schedule the remaining 7 posts across the next 10-14 days.
- [ ] Image render workflow — confirm how the screenshot HTML files become posted PNG/JPG images for FB/IG (manual screenshot, render script, social-image-builder skill?).